ob体育官网入口

The Foundation 3

Wailuo Offshore Wind Power Project, located in Zhanjiang, Guangdong province,is plannaed to be equipped with 36 sets of MySE5.5-155 wind turbines with a total capacity of 198MW. The windfarm has the medium-weathered rock stratum with sandy soil and clay geology, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the diameter of 6.5-7m which is applicable within water depth of 19m through the multiple round of iterative computations jointly carried out by the design institute and MingYang.The construction of the first monopile foundation is completed before June 30, 2018.


站点地图-xml  
ob体育官网入口(中国)有限责任公司
  赛博体育  澳门mg真人电子(中国)有限公司  宝马1211娱乐网站(中国)有限公司  江苏快3  爱玩彩(中国)有限公司  九州体育(中国)有限公司官网  宝博游戏官方下载(中国)有限公司  威尼斯新版本(中国)科技有限公司  百人牛牛(中国)科技有限公司